Page 1 of 94 >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Next >> All
|
| 1. |
New pavement at uscg msu port arthur, texas
|
| 2. |
Recovery,glac-0087500a & c, correct critical health & life safety hazards at many glacier hotel
|
| 3. |
Recovery-5psse-10-0081
|
| 4. |
Recovery--z-- replace capehart pumping station ellsworth afb, sd
|
| 5. |
Recovery--z--project number 2570, canton lake, ok
|
| 6. |
Covington county ewp project
|
| 7. |
Divesture of 4.16kv primary power system
|
| 8. |
Recovery--z--project number 74945, lake texoma, denison dam, tx
|
| 9. |
Recovery--z--project number 33810, restore failing roof admin bldg 547 & install photovoltaic system
|
| 10. |
Recovery-project # sxht 06-1040, replace windows and doors, south chapel
|
| 11. |
Recovery: energy efficiency upgrades design-build (d/b) construction services at the wheeler federal office building in baker city oregon – gsa, northwest/arctic region
|
| 12. |
Recovery--z--project number 35605, replace outdated chillers and boilers
|
| 13. |
Recovery – energy efficiency upgrades for bonneville power administration (bpa) building 905 and general services administration (gsa) building 911, portland or
|
| 14. |
Recovery - arra john weld peck federal building modernization project, phase 2
|
| 15. |
Recovery-ffs project-r3pc tas::14 1610::tas-replace propane fired boiler system with energy efficient geothermal heating system at the jordan river national fish hatchery. - solicitation 1
|
| 16. |
Meramec river basin, flood protection project. valley park fishpot creek bank protection, st. louis county, missouri. previously advertised under w912p910r0714 - solicitation 1
|
| 17. |
Recovery z--recovery act - renovate radiology for position electron transformation (pet) ct install at the omaha vamc - amendment 1
|
| 18. |
Recovery z--recovery (addition) - modernize main lobby (gi) - amendment 1
|
| 19. |
Recovery z--repair/upgrade mechanical systems - solicitation 1
|
| 20. |
Recovery z--recovery (addition) - renovate 1st floor for dental - amendment 1
|
| 21. |
Recovery - water supply well connection. tas:: 14-1610 2009/2010 ffs project #r5ra. - solicitation 1
|
| 22. |
Recovery z--recovery - renovate for new coolers and freezers - amendment 2
|
| 23. |
Recovery tas:: 14 1041 casa pmis #115259replacing the soil-cement and concrete walking trail and receiving area at jimmy carters boyhood farm - amendment 1
|
| 24. |
Recovery--z--project number 510, mcclellan-kerr arkansas river navigation system, ok repair spillway weirs and sill plates, w.d. mayo lock & dam 14, mcclellan-kerr arkansas river navigation system` - solicitation 2
|
| 25. |
Specialty care expansion-va medical center in san antonio, texas - amendment 1
|
| 26. |
Polyurethane foam insulation - amendment 1
|
| 27. |
Polyurethane foam insulation - solicitation 1
|
| 28. |
Des moines riverwalk, stage 1, court avenue kiosk and landscaping - amendment 6
|
| 29. |
Recovery--z--melvin price locks and dam, dam tainter gate debris shields installation contract, project 111051 - solicitation 1
|
| 30. |
Recovery z--recovery act - renovate nursing home care unit - amendment 2
|
| 31. |
Recovery z--recovery act - renovate nursing home care unit - amendment 1
|
| 32. |
Il construction veteran opiopio - solicitation 1
|
| 33. |
Recovery - removal and construction of barbwire fence located near cheyenne, oklahoma - amendment 2
|
| 34. |
Recovery - roadway shaping & aggregate surfacing, bia route 6, crow creek reservation, ft. thompson, south dakota - solicitation 1
|
| 35. |
Bldg 21 asbestos tile ceiling replacement - amendment 1
|
| 36. |
Recovery--z--project number 36311, upgrade interior of chapels, b-637/843 - amendment 2
|
| 37. |
Recovery--z--project number 36311, upgrade interior of chapels, b-637/843 - amendment 1
|
| 38. |
Recovery--z--project number 38836, renovate building 219 des - solicitation 1
|
| 39. |
Gulf intracoastal waterway, texas, main channel across aransas bay in aransas and calhoun counties, texas, pipeline dredging. - amendment 1
|
| 40. |
Recovery z--recovery act - replace nurse call system, building 500 project# 691-09-104wl - amendment 2
|
| 41. |
Recovery - construction of bat-accessible gateat state of texas mine features #93-003, 93-004, and 93-005 at coronado national memorial - amendment 2
|
| 42. |
Z- air-conditioning diffuser replacement
|
| 43. |
Recovery - big branch bridge reconstruction - solicitation 1
|
| 44. |
Gulf intracoastal waterway (giww), in chamber and galveston counties, tx, high island to rollover, bolivar flare, and channel to port bolivar. - ifb abstract
|
| 45. |
Recovery - modoc national forest boles creek concrete ford resurfacing - amendment 2
|
| 46. |
Recovery--z--project number 010020, lockwoods folly river, nc, project number 074622, shallotte river, nc clearing and spillway system maintenance, southern disposal area 284 & 300, brunswick county, nc - solicitation 1
|
| 47. |
Recovery-- rough fork trail restoration
|
| 48. |
Facilities maintenance services (landside) at military ocean terminal, sunny point (motsu) - southport, nc
|
| 49. |
Recovery--z--project number 39223, carpentry, elect, plumbing, hvac, repairs multiple bldgs.
|
| 50. |
Recovery--z--project number 000030, atlantic intracoastal waterway to st johns river, nc clearing and spillway system maintenance, northern disposal areas 16, 19, and 21, hyde and pamlico counties, nc
|
| 51. |
Recovery - mount margaret/lady moon/molly lake and elkhorn creek trailheads - arapaho and roosevelt nf and pawnee national grassland - amendment 2
|
| 52. |
Recovery--z--dripping springs rd resurfacing
|
| 53. |
Esat, lewis and clark national forest, north fork sun river pack suspension bridge repair - question and answers no. 3
|
| 54. |
Recovery--z--project number 510, mcclellan-kerr arkansas river navigation system, ok repair spillway weirs and sill plates, w.d. mayo lock & dam 14, mcclellan-kerr arkansas river navigation system` - solicitation 1
|
| 55. |
Recovery--z--saginaw va medical center hvac replacement, saginaw, michigan - questions and answers
|
| 56. |
Idiq contract roofing at sierra army depot / hawthorne army depot / reno, nevada
|
| 57. |
Idiq contract for renovation at sierra army depot / hawthorne army depot / reno nevada
|
| 58. |
Recovery - historic building restoration on the superior nf - response to questions
|
| 59. |
Recovery--z--- board burges culvert/surface replacement
|
| 60. |
Dnsc hammond in depot facilities maintenance services
|
| 61. |
Dnsc scotia ny depot facilities maintenance services
|
| 62. |
Recovery - roman nose trail bridge replacement, idaho panhandle national forests, saics 237310, service code z - amendment 4
|
| 63. |
Dnsc warren oh depot facilities maintenance services
|
| 64. |
Recovery--z--project number 38836, renovate building 219 des
|
| 65. |
W912qg-10-r-0003, sources sought has been corrected to add fsc code z-124 and anticipated project will be performed at mcentire joint national guard base (jngb).
|
| 66. |
Design/build repair dormitory b-714 - solicitation 1
|
| 67. |
Station monterey pier fire main supply line repair, monterey, ca - solicitation 1
|
| 68. |
Recovery-plumbing, heating, and air-conditioning - amendment 2
|
| 69. |
Recovery--z--project number 34289, repair bldg 2930 fitness center--floors, hvac, interior finishes, building envelope renovation of building 2930, fitness center - ifb abstract
|
| 70. |
Repair roof bldgl #370 - pre-proposal conference/site visit reservation form
|
| 71. |
Site security installation with new accessibility ramp - toledo, oh
|
| 72. |
Z- air-conditioning diffuser replacement
|
| 73. |
Recovery-scout creek culvert replacement
|
| 74. |
Recovery-sage creek culvert replacement
|
| 75. |
Recovery z--repair/upgrade mechanical systems
|
| 76. |
Bra drum dryers & evaporator removal, ecp-1706 - solicitation
|
| 77. |
Recovery--z-- replace capehart pumping station ellsworth afb, sd
|
| 78. |
Recovery z--upgrade security system - d-b
|
| 79. |
Mold remediation - mammoth quarters, yellowstone national park.
|
| 80. |
Recovery--z--project number vb-500-10j, renovate building 1201, ft. stewart, georgia.
|
| 81. |
Il construction veteran opiopio
|
| 82. |
Repair boilers, multiple bldgs
|
| 83. |
Replace roof coating on two buildings - ancdf-rfq-w10-0413
|
| 84. |
Wewoka dental department
|
| 85. |
Recovery--z--project number fe10205-8j, repair intersection at airborne st. and wickham ave. extend railroad crossing, fort campbell, kentucky
|
| 86. |
Recovery - roadway shaping & aggregate surfacing, bia route 6, crow creek reservation, ft. thompson, south dakota
|
| 87. |
Maintain street striping: various locs basewide
|
| 88. |
Ashland road rocking
|
| 89. |
Maintain parking lot striping
|
| 90. |
Hvac setback controls
|
| 91. |
Road maintenance (2010-2013): hood canal ranger district (north) and pacific ranger district
|
| 92. |
Pre-solicitation notice to move two tsw(top spillway wier)components to upstream spillway slots at mcnary dam, remove the downstream tsw2 components and haul away for disposal.
|
| 93. |
Recovery: los padres paving project
|
| 94. |
Station monterey pier fire main supply line repair, monterey, ca
|
| 95. |
Parking lot upgrades at border patrol sector headquarters, swanton, vt
|
| 96. |
Design-build, endwall repair, ft. pierce, florida - questionnaire
|
| 97. |
Idiq contract for roofing at sierra ad/ hawthorne ad, reno nv
|
| 98. |
Idiq contract roofing at sierra army depot / hawthorne army depot / reno, nevada
|
| 99. |
Idiq contract for renovation at sierra army depot / hawthorne army depot / reno nevada
|
| 100. |
Idiq contract for renovation at sierra ad / hawthorne ad / reno, nevada
|
|
Page 1 of 94 >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Next >> All
|