FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

  Page 1 of 94  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>   All
 
1. New pavement at uscg msu port arthur, texas
2. Recovery,glac-0087500a & c, correct critical health & life safety hazards at many glacier hotel
3. Recovery-5psse-10-0081
4. Recovery--z-- replace capehart pumping station ellsworth afb, sd
5. Recovery--z--project number 2570, canton lake, ok
6. Covington county ewp project
7. Divesture of 4.16kv primary power system
8. Recovery--z--project number 74945, lake texoma, denison dam, tx
9. Recovery--z--project number 33810, restore failing roof admin bldg 547 & install photovoltaic system
10. Recovery-project # sxht 06-1040, replace windows and doors, south chapel
11. Recovery: energy efficiency upgrades design-build (d/b) construction services at the wheeler federal office building in baker city oregon – gsa, northwest/arctic region
12. Recovery--z--project number 35605, replace outdated chillers and boilers
13. Recovery – energy efficiency upgrades for bonneville power administration (bpa) building 905 and general services administration (gsa) building 911, portland or
14. Recovery - arra john weld peck federal building modernization project, phase 2
15. Recovery-ffs project-r3pc tas::14 1610::tas-replace propane fired boiler system with energy efficient geothermal heating system at the jordan river national fish hatchery. - solicitation 1
16. Meramec river basin, flood protection project. valley park fishpot creek bank protection, st. louis county, missouri. previously advertised under w912p910r0714 - solicitation 1
17. Recovery z--recovery act - renovate radiology for position electron transformation (pet) ct install at the omaha vamc - amendment 1
18. Recovery z--recovery (addition) - modernize main lobby (gi) - amendment 1
19. Recovery z--repair/upgrade mechanical systems - solicitation 1
20. Recovery z--recovery (addition) - renovate 1st floor for dental - amendment 1
21. Recovery - water supply well connection. tas:: 14-1610 2009/2010 ffs project #r5ra. - solicitation 1
22. Recovery z--recovery - renovate for new coolers and freezers - amendment 2
23. Recovery tas:: 14 1041 casa pmis #115259replacing the soil-cement and concrete walking trail and receiving area at jimmy carters boyhood farm - amendment 1
24. Recovery--z--project number 510, mcclellan-kerr arkansas river navigation system, ok repair spillway weirs and sill plates, w.d. mayo lock & dam 14, mcclellan-kerr arkansas river navigation system` - solicitation 2
25. Specialty care expansion-va medical center in san antonio, texas - amendment 1
26. Polyurethane foam insulation - amendment 1
27. Polyurethane foam insulation - solicitation 1
28. Des moines riverwalk, stage 1, court avenue kiosk and landscaping - amendment 6
29. Recovery--z--melvin price locks and dam, dam tainter gate debris shields installation contract, project 111051 - solicitation 1
30. Recovery z--recovery act - renovate nursing home care unit - amendment 2
31. Recovery z--recovery act - renovate nursing home care unit - amendment 1
32. Il construction veteran opiopio - solicitation 1
33. Recovery - removal and construction of barbwire fence located near cheyenne, oklahoma - amendment 2
34. Recovery - roadway shaping & aggregate surfacing, bia route 6, crow creek reservation, ft. thompson, south dakota - solicitation 1
35. Bldg 21 asbestos tile ceiling replacement - amendment 1
36. Recovery--z--project number 36311, upgrade interior of chapels, b-637/843 - amendment 2
37. Recovery--z--project number 36311, upgrade interior of chapels, b-637/843 - amendment 1
38. Recovery--z--project number 38836, renovate building 219 des - solicitation 1
39. Gulf intracoastal waterway, texas, main channel across aransas bay in aransas and calhoun counties, texas, pipeline dredging. - amendment 1
40. Recovery z--recovery act - replace nurse call system, building 500 project# 691-09-104wl - amendment 2
41. Recovery - construction of bat-accessible gateat state of texas mine features #93-003, 93-004, and 93-005 at coronado national memorial - amendment 2
42. Z- air-conditioning diffuser replacement
43. Recovery - big branch bridge reconstruction - solicitation 1
44. Gulf intracoastal waterway (giww), in chamber and galveston counties, tx, high island to rollover, bolivar flare, and channel to port bolivar. - ifb abstract
45. Recovery - modoc national forest boles creek concrete ford resurfacing - amendment 2
46. Recovery--z--project number 010020, lockwoods folly river, nc, project number 074622, shallotte river, nc clearing and spillway system maintenance, southern disposal area 284 & 300, brunswick county, nc - solicitation 1
47. Recovery-- rough fork trail restoration
48. Facilities maintenance services (landside) at military ocean terminal, sunny point (motsu) - southport, nc
49. Recovery--z--project number 39223, carpentry, elect, plumbing, hvac, repairs multiple bldgs.
50. Recovery--z--project number 000030, atlantic intracoastal waterway to st johns river, nc clearing and spillway system maintenance, northern disposal areas 16, 19, and 21, hyde and pamlico counties, nc
51. Recovery - mount margaret/lady moon/molly lake and elkhorn creek trailheads - arapaho and roosevelt nf and pawnee national grassland - amendment 2
52. Recovery--z--dripping springs rd resurfacing
53. Esat, lewis and clark national forest, north fork sun river pack suspension bridge repair - question and answers no. 3
54. Recovery--z--project number 510, mcclellan-kerr arkansas river navigation system, ok repair spillway weirs and sill plates, w.d. mayo lock & dam 14, mcclellan-kerr arkansas river navigation system` - solicitation 1
55. Recovery--z--saginaw va medical center hvac replacement, saginaw, michigan - questions and answers
56. Idiq contract roofing at sierra army depot / hawthorne army depot / reno, nevada
57. Idiq contract for renovation at sierra army depot / hawthorne army depot / reno nevada
58. Recovery - historic building restoration on the superior nf - response to questions
59. Recovery--z--- board burges culvert/surface replacement
60. Dnsc hammond in depot facilities maintenance services
61. Dnsc scotia ny depot facilities maintenance services
62. Recovery - roman nose trail bridge replacement, idaho panhandle national forests, saics 237310, service code z - amendment 4
63. Dnsc warren oh depot facilities maintenance services
64. Recovery--z--project number 38836, renovate building 219 des
65. W912qg-10-r-0003, sources sought has been corrected to add fsc code z-124 and anticipated project will be performed at mcentire joint national guard base (jngb).
66. Design/build repair dormitory b-714 - solicitation 1
67. Station monterey pier fire main supply line repair, monterey, ca - solicitation 1
68. Recovery-plumbing, heating, and air-conditioning - amendment 2
69. Recovery--z--project number 34289, repair bldg 2930 fitness center--floors, hvac, interior finishes, building envelope renovation of building 2930, fitness center - ifb abstract
70. Repair roof bldgl #370 - pre-proposal conference/site visit reservation form
71. Site security installation with new accessibility ramp - toledo, oh
72. Z- air-conditioning diffuser replacement
73. Recovery-scout creek culvert replacement
74. Recovery-sage creek culvert replacement
75. Recovery z--repair/upgrade mechanical systems
76. Bra drum dryers & evaporator removal, ecp-1706 - solicitation
77. Recovery--z-- replace capehart pumping station ellsworth afb, sd
78. Recovery z--upgrade security system - d-b
79. Mold remediation - mammoth quarters, yellowstone national park.
80. Recovery--z--project number vb-500-10j, renovate building 1201, ft. stewart, georgia.
81. Il construction veteran opiopio
82. Repair boilers, multiple bldgs
83. Replace roof coating on two buildings - ancdf-rfq-w10-0413
84. Wewoka dental department
85. Recovery--z--project number fe10205-8j, repair intersection at airborne st. and wickham ave. extend railroad crossing, fort campbell, kentucky
86. Recovery - roadway shaping & aggregate surfacing, bia route 6, crow creek reservation, ft. thompson, south dakota
87. Maintain street striping: various locs basewide
88. Ashland road rocking
89. Maintain parking lot striping
90. Hvac setback controls
91. Road maintenance (2010-2013): hood canal ranger district (north) and pacific ranger district
92. Pre-solicitation notice to move two tsw(top spillway wier)components to upstream spillway slots at mcnary dam, remove the downstream tsw2 components and haul away for disposal.
93. Recovery: los padres paving project
94. Station monterey pier fire main supply line repair, monterey, ca
95. Parking lot upgrades at border patrol sector headquarters, swanton, vt
96. Design-build, endwall repair, ft. pierce, florida - questionnaire
97. Idiq contract for roofing at sierra ad/ hawthorne ad, reno nv
98. Idiq contract roofing at sierra army depot / hawthorne army depot / reno, nevada
99. Idiq contract for renovation at sierra army depot / hawthorne army depot / reno nevada
100. Idiq contract for renovation at sierra ad / hawthorne ad / reno, nevada
  Page 1 of 94  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>   All